      Springs on the production line with the work of parts and components have a close relationship, so when not only in the use of equipment for maintenance, the same parts also carried out maintenance of demolition maintenance, which in the process of disassembly need to respect a certain Requirements and standards
1, plate spring production line to be demolished in order, the general principle is the reverse order with the assembly. Usually from the outside to the inside, from top to bottom, followed by demolition.
2, in order to facilitate the rapid assembly after maintenance, with the parts and components needed to do a good job in the demolition of the parts of the print, mark work.
3, in accordance with the type of assembly parts, parts were decontaminated, rust, cleaning and proper custody, to avoid overlapping, bending, abrasion, sell dirt two small parts should be boxed to save.
4, in the calibration work should be noted that the spring plate production line demolition of parts wear, damage causes and parts life cycle are registered in the book, as historical data, can be divided into available parts, parts to be repaired, scrap parts.
5, in the removal of the spring production line is more complex or difficult to disassemble the parts and components, you should first understand the parts of the structure, and other parts of the connection between the way and parts of the back loose direction, while ready for special or corresponding work, Fixture.
6, need to hammer to fight the parts to be demolished, you must mat or soft metal mats material, must not be directly hammered parts.